- Tanzania Gives Go-Ahead to Massive Sh80.85 Billion Mbamba Bay Port Construction Project
- KeNHA Unveils Strategic Sh394 Billion Plan to Construct Major Highways in Kenya
- Ruto’s Multi-Million Plan to Host the 2027 Africa Cup of Nations (AFCON) Tournament in Kenya
- Tanzania's Modern Industrial Park Project on Course with 3.5 Trillion Investment
- African Development Bank Greenlights $696.41 Million for Phase 2 of Tanzania-Burundi-DRC SGR
- Biggest construction trade exhibition announced in Nairobi at KICC
- President Ruto's Vision of Affordable Housing Projects Taking Shape in Kenya
- Ethiopia Receives $720 Million in Funding for Road Construction Project
- $3.24 Billion to be Invested in Tanzania SGR Construction by Spain
- Ksh700 Billion to be Invested to Complete Pending Kenyan Road Projects
Long-stalled US $30bn LNG project in Lindi Tanzania to be revived
The newly sworn-in Tanzania President Samia Suluhu Hassan is set to revive the long-stalled US $30bn liquefied natural gas LNG project in Lindi Tanzania. The project was sidelined under the administration of the former President, the late John Pombe Magufuli with his administration instead prioritising the East Africa Crude Oil Pipeline to take oil from Uganda to the Tanzanian port of Tanga.
According to the President, she tried to work on the LNG project in Lindi Tanzania when she was sworn in as the vice president back in 2015 but discovered it was beyond her and stopped. Nevertheless, she has now directed the Ministry of Energy to accelerate talks with the project’s stakeholders, Shell and Equinor.
LNG project in Lindi,Tanzania LNG would involve gas from Shell-operated blocks 1 and 4 and Equinor’s Block 2 being piped from deep-water subsea wells to two or three liquefaction trains at Lindi. These blocks house about 35 trillion cubic feet of recoverable gas, split about evenly between the two operators’ assets.
According to Shell, The offshore deepwater gas in the south of Tanzania is located in fields
over 100km offshore, and some are in water that is up to 2,500m deep and 2,500m below seabed. Distance between the fields can also be over 100km apart. Depth, distance and
terrain means the Tanzania LNG project is at the cutting edge of deep sea exploration technology and provides a unique opportunity for developing unique competencies and
capabilities in the local supply chain and within TPDC as the project tackles these technical obstacles.
LNG is natural gas that has been cleaned and cooled in huge refrigeration units to a temperature of around -162oC. The LNG process converts the gas into liquid, substantially reduces the volume of the gas more than 600 times. This is similar to shrinking a football to the size of a marble. This makes the gas easier to store and transport safely to markets around the world in purpose-built ships.
Posted on : 19 Apr,2024
Exhibitions In Africa
- 25th Buildexpo Kenya 2024
KICC, Nairobi, kenya
05 - 07, June 2024 - 09th Afriwood Kenya 2024
KICC, Nairobi, kenya
05 - 07, June 2024 - 09th LightExpo Kenya 2024
KICC, Nairobi, kenya
05 - 07, June 2024 - 08th Minexpo Africa 2024
KICC, Nairobi, Kenya
05 - 07, June 2024 - 25th Buildexpo Tanzania 2024
Diamond Jubilee Expo Center, Dar-es-Salaam, Tanzania
12 - 14, Sep 2024 - 08th Afriwood Tanzania 2024
Diamond Jubilee Expo Center, Dar-es-Salaam, Tanzania
12 - 14, Sep 2024 - 08th LightExpo Tanzania 2024
Diamond Jubilee Expo Center, Dar-es-Salaam, Tanzania
12 - 14, Sep 2024 - 08th Minexpo Tanzania 2024
Diamond Jubilee Expo Center, Dar-es-Salaam, Tanzania
12 - 14, Sep 2024